Multi-site rolloutRegional ISP connectivity program
Cabling and network turn-up across dozens of sites in Austin, San Antonio, the Hill Country, and Midland (2024 to 2025).
Work completed
- Ran and terminated new low-voltage drops for service handoffs
- Connected and verified network equipment at each site
- Repeat visits across multiple program phases on a fixed schedule
Network refreshData rack swap-outs & site remediation
Rack replacements and network fixes at sites from Houston to Corpus Christi, Victoria, Austin, and Midland.
Work completed
- Swapped out data racks and re-patched live connections
- Tested runs and resolved issues flagged in prior site surveys
- Fixed wireless coverage and patching problems
Enterprise networkSwitch refresh, SD-WAN & VLAN segmentation
Network hardware upgrades for enterprise clients, including a national hotel brand.
Work completed
- Aruba switch refresh at a fleet-leasing branch
- SD-WAN router installs
- VLAN network segmentation project, multiple visits
SecurityLarge camera & access control surveys
Walkthroughs that scoped 74- and 78-camera systems and a 29-door access control project.
Work completed
- Mapped camera locations, cable paths, and network needs
- Scoped door hardware and access control requirements
- Camera installs, replacements, and troubleshooting
FiberFiber runs on phased cabling projects
Fiber runs alongside copper on phased cabling and punch-list work in Midland and Central Texas.
Work completed
- Fiber and copper runs during phased build-outs
- Patch cabling and testing
- Punch-list closeout
Heights & industrialLift and PPE-required sites
Access point troubleshooting at 20 to 25 ft on lifts in a distribution center, and cellular gateway work at PPE-required industrial sites.
Work completed
- Lift-certified access point work at height
- Re-terminated shielded Cat6 for outdoor equipment
- Installed PoE power for cellular gateways